Published on by Trudi Schifter, CEO and Founder AquaSPE in Case Studies
Washington Park Reservoir Improvements, Portland
By CMTS LLC
The Portland Water Bureau is replacing the Washington Park reservoir, a project that continues through 2024. CMTS is providing Estimating and Quality Assurance contract compliance inspection — specifically Electrical and Mechanical inspection and overall Quality Assurance Management.
Washington Park reservoirs have been in service since 1894. When completed, this project will supply water to Portland’s west side and serve more than 360,000 people, including all downtown businesses and residents, 20 schools, five hospital complexes, and more than 60 parks. This system of water conveyance and storage makes Portland a livable and thriving community, ensuring the public health and economic viability.
This project is building a new 17.4-million gallon, seismically reinforced below-ground reservoir, within the footprint of the existing Reservoir 3 (upper) with a reflection pool/water feature on top. While retaining the historic look and feel of the original reservoir, it has been engineered to withstand ongoing landslide encroachment and potentially catastrophic effects of a major earthquake.
The existing Reservoir 4 (lower) has been disconnected from the public drinking water system and is being developed into a lowland wildlife habitat area, bioswale, and reflecting pool.
Milestones:
- Earthwork Stabilization September 2018
- Reservoir foundation March 2019
- Reservoir Construction March 2020
- Reservoir design to withstand subduction zone earthquake 9.0+ and be operational thereafter.
Attached link
http://www.youtube.com/embed/sU9xan6iL0oTaxonomy
- Reservoir