thanks for ur comments and reply actually the canal has not been construct yet. it is now in design stage....total discharge 54 cusec before the syphone channel dimension are bed width 5 ft depth 2.5ft free board 1ft long slope 1 in 2000 and maining n 0.018 length of syphon 420 m

Published by

thanks for ur comments and reply actually the canal has not been construct yet. it is now in design stage....total discharge 54 cusec before the syphone channel dimension are bed width 5 ft depth 2.5ft free board 1ft long slope 1 in 2000 and maining n 0.018 length of syphon 420 m