Pure Water Group supplies CEDI equipment for solar power plant to LEF Ingenieros • Pure Water Group
Published on by Bart Ossenblok, Sales & Marketing in Technology
Pure Water Group recently supplied and commissioned a Continuous Electrodeionization (CEDI) system for its Spanish partner, LEF Ingenieros, a multidisciplinary team of professionals in water treatment. The CEDI system will produce Ultrapure water for the PS10 Solar Power Plant, the world’s first commercial concentrating solar power tower, located near Seville in Andalusia, Spain.
This Solar Power Plant is powered by 624 large movable mirrors directed to a singular mirror on the tower and produces 23 GWh of electricity, which is enough to supply power to a population of 10,000.
The CEDI system, designed and manufactured by Pure Water Group, features two independently operated Ionpure VNX-Mini modules, each with a nominal capacity of 12 m³/h, mounted on a common skid. This flexible configuration allows for a wide range variable Ultrapure water output by enabling either one or both CEDI modules, depending on demand.
This project strengthens the ongoing partnership between LEF Ingenieros and Pure Water Group, and demonstrates their shared commitment to delivering innovative, sustainable water treatment solutions that support the transition to a clean energy future.
Pure Water Group: Engineering purity
Attached link
https://purewatergroup.com/pure-water-group-supplies-cedi-equipment-for-solar-power-plant-to-lef-ingenierosTaxonomy
- Solar Water Disinfection
- Solar Energy
- Solar Water Purification Systems