EcoTec EcoSBR plant with a capacity of 100 KLD is installed within 2 days by EcoTec technical expert with the help of 2 assistants at any site. The video shows how quickly EcoSBR sequencing batch reactor sewage treatment plant can be installed, tested and commissioned.
Source: EcoTec Engineers and Consultants