Limitations and obstacles for the development of Hydropower plants with installed capacity below 1MW.
The article discusses the limitations and challenges that communities and project developers face on when structuring small hydropower plants projects as distributed generation projects in Colombia. This topic aquires significant importance in the country as a engine of rural development in a frame after-peace agreement and the question about a "new rural country".
Download the article in Spanish below or read the whole issue 48 of La Revista de Ingeniería here:
Attached link
https://ojsrevistaing.uniandes.edu.co/ojs/uflip/Revista_de_ingenieria_48/page_85.htmlMedia
Taxonomy
- Rural Water Supply & Sanitation
- Hydropower
- Rural Development
- Rural development
- Solar, Wind, Biogas, hydropower