Egypt 40 MLD in Egypt (3093)

Published on by in Completed Designs

Your Activated Sludge Design project for Egypt (3093) is finished.

Influent parameters provided by the project designer:

Parameters Annual average Units
COD 800 mg/l
BOD5 501 mg/l
Total Suspended Solids (TSS) 400 mg/l
Total Kjeldahl Nitrogen (TKN) 26 mg/l
Total Phosphorous (TP) 9 mg/l
Design minimum wastewater temperature (Tmin) 20.055743479208481 °C
Design maximum wastewater temperature (Tmax) 30 °C

You can access your documents using the following links:

Design Basis
Process Scheme
Technical Description
Equipment List
OPEX
General Arrangement