East Dam in China (2543)

Published on by in Completed Designs

Your Activated Sludge Design project for China (2543) is finished.

Influent parameters provided by the project designer:

Parameters Annual average Units
COD 350 mg/l
BOD5 160 mg/l
Total Suspended Solids (TSS) 185 mg/l
Total Kjeldahl Nitrogen (TKN) 62 mg/l
Total Phosphorous (TP) 7.1 mg/l
Design minimum wastewater temperature (Tmin) 10 °C
Design maximum wastewater temperature (Tmax) 24 °C

You can access your documents using the following links:

Design Basis
Process Scheme
Technical Description
Equipment List
OPEX
General Arrangement