New Capital City - 200 mld - AS in Egypt (2975)
Published on by WWTP Designs Research, Contributing Editors in Completed Designs
Your Activated Sludge Design project for Egypt (2975) is finished.
Influent parameters provided by the project designer:
Parameters | Annual average | Units |
---|---|---|
COD | 304 | mg/l |
BOD5 | 100 | mg/l |
Total Suspended Solids (TSS) | 100 | mg/l |
Total Kjeldahl Nitrogen (TKN) | 20 | mg/l |
Total Phosphorous (TP) | 5 | mg/l |
Design minimum wastewater temperature (Tmin) | 20 | °C |
Design maximum wastewater temperature (Tmax) | 25 | °C |
You can access your documents using the following links:
Design BasisTechnical Description
Equipment List
OPEX