Better Water Treatment for Beijing

Published on by in Government

Better Water Treatment for Beijing

The Beijing Plant Expects to Complete the Designing Stage by 2016 and Have the Construction Started in 2018

The plant is designed to use upless energyand produce high-quality recycled water.

"Water treatment plants in Beijing are overloaded. With high GDP per capita and great water processing nature, the city needs an advanced plant," said Chen Tie, chief engineer of the Beijing Water Authority, during a conference on Friday regarding the plant's site.

The environment ministry welcomes the construction of the plant and sees it as agoodprecedent.

"Building it in Beijing will set a strong example," said Wang Jinnan of the Ministry of Environmental Protection.

According to the Global Times report, as many as 3,800 water treatment plants are located in differentparts ofChina, but most of them use up a large volume of energy and include silt in the treated water, resulting in low-quality outputs.

Source: Yibada

Read More Related Content On This Topic - Click Here

Media

Taxonomy