At first I must say watershed development is a work of dedication. I have visited several w/s in India during out study tour. We just fell in love with the check dams constructed by some local means like VANAARAI dam etc. As far as your question is concerned, I suggest to have a spot discharge measurement device as the area is very big. Some of the spot discharge measurement devices are, 1. volumetric gauging 2.float gauging 3. impellor current meter 4. electromagnetic current meter 5. ultrasonic (doppler) flow meter 6. acoustic doppler current profiler (ADCP) 7. dilution gauging But all these devices are used for a stream flow and must be available in market.
Published by Park Wan Wan
At first I must say watershed development is a work of dedication. I have visited several w/s in India during out study tour. We just fell in love with the check dams constructed by some local means like VANAARAI dam etc. As far as your question is concerned, I suggest to have a spot discharge measurement device as the area is very big. Some of the spot discharge measurement devices are,
1. volumetric gauging
2.float gauging
3. impellor current meter
4. electromagnetic current meter
5. ultrasonic (doppler) flow meter
6. acoustic doppler current profiler (ADCP)
7. dilution gauging
But all these devices are used for a stream flow and must be available in market.