New Capital City v4 in Egypt (2988)

Your Activated Sludge Design project for Egypt (2988) is finished. Influent parameters provided by the project designer: Parameters Annual average Units COD 304 mg/l BOD5 140 mg/l Total Suspended Solids (TSS) 140 mg/l Total Kjeldahl Nitrogen (TKN) 27 mg/l Total Phosphorous (TP) 5 mg/l Design minimum wastewater temperature (Tmin) 20 °C Design maximum wastewater temperature (Tmax) 30 °C You can access your documents using the following links: Design Basis Process Scheme Technical Description Equipment List OPEX General Arrangement Comparison Document