Calculating canal loss
Published on by Engr. Salah Ud Din, Deputy Director at Pakistan Council of Research in Water Resources in Technology
A canal having length of 44km and 54 cusec discharge is required for it. How much allowance should I keep for loss along the canal? Soil is clayey and sandy mix
Taxonomy
- Leakage Reduction
- Design & Construction
- Water Loss Control
1 Answer
-
Why you want to be a non tecnocrat and an easy going person. Why you can not measure the losses in real time? Measure the losses by the seepage method along difference reaches of the canal depending upon vicinity of rivers, etc and other factors.
1 Comment
-
actually the canal has not been belt yet.....it is now in design phase
-