Work experience
Work Schedule Manager – Methods Technician
Tender of M1 Widening Jct 25-28, widening of the M1 Motorway in United Kingdom from 2x3 to 2x4 lanes and re-surfacing over 23km including rebuilding of crossing structures.
Methods technician in charge of methods proposal and work schedule manager.
VINCI Construction Grands Projets
2006-08 - 2006-09
Section manager – Work Schedule Manager – Cost Controller – Public relations
A11 Motorway Angers (France) north bypass, 450 million Euros, consisting in construction 14,3 km of urban motorway.
In charge of the works schedule, section manager of civil structures, public relations and cost control.
VINCI Construction Grands Projets
2004-06 - 2008-05
Section Manager
A86 Duplex Tunnel, 1.6 billion Euros design and build project for the construction of a 10 km tunnel on two levels on the Paris West circular motorway for Cofiroute.
Section Manager on 19 electromechanical, metal works, signs, paintings, sections.
VINCI Construction Grands Projets
2008-07 - 2009-11
Methods Manager
Elefsina-Korinthe-Patras-Pyrgos-Tsakona motorway project (Greece), Korinthe-Patras section, 520 million Euros.
In charge of methods for 12 km of motorway rebuilding.
VINCI Constrution Grands Projets
2009-11 - 2010-03
Project Manager
Public buildings structural works, two gym and a cultural centre from 0.8 to 2.3 million Euro.
Project manager in charge of preparation to achievement of structural works.2010-05 - 2010-09
Project Manager Assistant (Tender)
Tender offer preparation for four hydroelectric projects, nine mining projects and four road and railways projects.
In charge of quantities take off, suppliers and subcontractors finding and price preparation.2011-05 - 2012-02
Project Manager Assistant
Bloom Lake Iron mine, shuttle conveyor foundation basis contract and tailing management. (2.5 and 40 million Canadian Dollars).
In charge shuttle conveyor foundation basis completion and contract claim and management of tailing transportation .
2012-03 - 2012-05
Project Manager Assistant
Canadian Royalties Inc. Nickel mine, rock excavation for harbour infrastructures and construction of a storage hall at Deception Bay. (115 million Canadian Dollars).
Project manager assistant in charge of work methods, work schedule building and update, and on site work management. EBC Inc2012-07 - 2012-12
Project Manager Assistant (Tender)
Tender offer preparation for five hydroelectric projects and two mining projects in the West Canadian provinces.
In charge of general work schedule preparation, construction methods definition and subcontractor price collection.
2013-01 - 2013-09
Work Schedule Manager
Upper Lillooet Hydroelectric Project in British Columbia, Canada. Design and construction of two hydroelectric power unit of de 77 MW and 27 MW for of 250 million de Canadian Dollars.
In charge of work schedule and methods.
2013-09 - 2014-05
Project Manager Assistant
On-going projects and cost estimation assistance.
In charge of the preparation of claims and assistance to projects in trouble.
2014-06 - 2014-09
Cost estimation engineer
In charge of technical and commercial offer preparation for international dam and tunnel tenders from 80 million to 1.3 billion Euros. Management of international, multicultural and intercompany team of 10 to 15 people.2014-11 - Present
Section Engineer
Channel Tunnel Rail Link, Contract 310, 386 million Euros construction project of a 14 km high speed railtracks section in United Kingdom.
Methods technician on piled slabs construction methods. Section Engineer for four footbridges construction.
VINCI Construction Grands Projets
2002-01 - 2004-05
Site Engineer
Channel Tunnel Rail Link, Contract 350, 42 million Euros construction project of a 1.252 m long launch and hammered viaduct for train high speed tracks.
Site engineer in charge of the deck hyper-structures construction, equipment and finishes. Management of fifteen workers.
VINCI Construction Grands Projets
2001-05 - 2001-12
Methods technician (Tender)
Tender Biscarrues dam project, earth weight dam, Spain. In charge of the concrete placing methods.VINCI Construction Grands Projets
2000-06 - 2000-07
Methods technician (Tender)
Tender Hallandsas railway tunnel project, Sweden. In charge of the segment fabrication methods equipment and logistic and responsible of the tunnel boring machine solutions analysis.
VINCI Construction Grands Projets
2000-08 - 2000-11
Methods technician (Tender)
Tender of Gothard railway tunnel project, Switzerland, various packages. In charge of general price estimating.
VINCI Construction Grands Projets
2000-11 - 2001-01
Methods technician (Tender)
Tender of Channel Tunnel Rail Link, Contract 310. In charge of the quantity measurement of piled slabs and crossing structures and of the piled slab construction methods.
VINCI Construction Grands Projets
2001-02 - 2001-04
Taxonomy
- Project Manager