Water Resources and Project Management Specialist (International)

Published by for Asian Development Bank (ADB)

Water Resources and Project Management Specialist (International)

T A-8484 INO: Sustainable Infrastructure Assistance Program - Technical Assistance Cluster Management Facility (Subproject 1) - Water Resources and Project Management Specialist (International) (46380-003) 

 

Consultant Type Individual
Selection Method Individual Consultant Selection (ICS)
Source International
Technical Proposal Not Applicable
Selection Title Sustainable Infrastructure Assistance Program - Technical Assistance Cluster Management Facility (Subproject 1)
Package Number
   
Package Name Water Resources and Project Management Specialist (International)
 
Advance Action
    Read only Checkbox Not Checked Yes
    Read only Checkbox Checked No
Engagement Period
    12
    MONTH
 
Consulting Services Budget
USD
    150,000
Budget Type
    Read only Checkbox Not Checked Estimated
    Read only Checkbox Checked Maximum
Approval Number 8484
Approval Date 11-Oct-2013
Estimated Short-listing Date 30-Mar-2018
Estimated Commencement Date 20-Apr-2018
Open to non-Member Countries
    Read only Checkbox Not Checked Yes
    Read only Checkbox Checked No

Additional Information

Possibility of contract extension
    Read only Checkbox Not Checked Yes
    Read only Checkbox Not Checked No
    Read only Checkbox Checked Not known
     
Possibility of consideration for downstream assignment
    Read only Checkbox Not Checked Yes
    Read only Checkbox Not Checked No
    Read only Checkbox Checked Not known
     
Indefinite Delivery Contract (IDC)
    Read only Checkbox Not Checked Yes
    Read only Checkbox Checked No
   
Country of assignment
    Indonesia

Contact Information

Project Officer Anthony Robert Gill
Designation Senior Country Specialist
    Asian Development Bank
Email agill@adb.org

 

 

Primary Agency Country Agency Role Contact Person
Read only Checkbox Checked  National Development Planning Agency (BAPPENAS) Indonesia Executing Agency Mr. Ikhwan Hakim
Read only Checkbox Not Checked  Ministry of Public Works Indonesia Implementing Agency  
Read only Checkbox Not Checked  National Development Planning Agency (BAPPENAS) Indonesia Implementing Agency  

 

Type Publication Date Published By Duration of Advertisement Deadline
Original 20-Mar-2018 Racel S. Verdillo 7 DAYS 26-Mar-2018
Re-Advertisement 28-Mar-2018 Racel S. Verdillo 7 DAYS 03-Apr-2018

 

 

Expertise
 Agriculture/ Rural Development 
Expertise Group Agriculture/Rural Development
TOR Keywords
 irrigation, modeling, flood risks management, water allocation 

 

 

Objective and Purpose of the Assignment

The Asian Development Bank (ADB) is providing financing and technical assistances to the Government of Indonesia to support the implementation of its water security program under the 2015–2019 National Medium-Term Development Plan. Ongoing investments are articulated around the improvement of water infrastructure delivery to support the broader water security and food security agenda. This includes L3455: Accelerating Infrastructure Delivery through Better Engineering Services Project, L3440: Flood Management in Selected River Basins Sector Project, and Loan 3529/8327(AIF)-INO: Integrated Participatory Development and Management of Irrigation Program. Technical assistances are providing support for implementation of those investments and to introduce innovations in the sector. Several investments are under preparation as reflected in the ADB’s country operations business plan, 2018–2020 for Indonesia. Additional resources are needed to ensure a timely and quality delivery of this growing portfolio and program.


Scope of Work

The consultant will support ADB, the Ministry of Public Works and Housing, and BAPPENAS to (i) ensure timely and quality outputs for ongoing operations; (ii) support liaison with executing and implementing agencies and management of technical assistances; and (iii) provide technical inputs for the formulation of strategies and pipelined water projects aligned with priorities from the Water Operational Plan 2011– 2020 and to the Climate Change Operational Framework 2017–2030. The consultant will directly report to ADB’s project officer over a period of 12 months.


Detailed Tasks and/or Expected Output

A. Project Management (i) Prepare and implement all administrative systems and procedures needed to review the quality of outputs of the ongoing projects to ensure that the quality is acceptable as per international standards, and the work is progressing as per plan. (ii) Identify best practices (climate adaptation, seismic risk proofing, water efficiency) relevant to the project and formulate activities to be part of the investments. (iii) Ensure that modeling works under L3455 and L3440 are taking into account climate change adaptation impacts, and recommend adjustments of allocations for other users and dams operations for more sustainable use of water resources, including identifying interdependencies and linkages water users across sectors particularly energy and domestic supplies. (iv) Undertake overall coordination and liaison on technical matters with the Directorate General of Water Resources (DGWR) and BAPPENAS, including attending stakeholder meetings, coordination of inputs, management and advise to the ADB, DGWR and BAPPENAS, as necessary. (v) Review the overall management of the planning, design and engineering of projects under the ongoing projects, to ensure that the engineering consultants are on track and providing expert advice as required. (vi) Review and ensure outputs are complete, well prepared using consistent formats, and contents are prepared to the highest standard. (vii) Review and ensure new project readiness and bankability with the relevant stakeholders and providing experts advise to address gaps, if any. (viii) Monitor the accuracy and timeliness of data, processing and transfer of information and reports to the ADB. (ix) Ensure that the government’s policies and standards are implemented in all contract packages and field supervision teams. (x) Identify important technical and managerial issues which affect progress, safety, quality and compliance with safeguards. (xi) Guide, coordinate and support the ongoing projects activities and provide overall guidance, direction and monitoring of the consultant performance to ensure that the progress is as per the planned schedule. (xii) Advise the ADB and DGWR on interventions needed to accelerate the implementation of ongoing projects. (xiii) Undertake capacity building workshops, training and knowledge sharing sessions on best practices in water infrastructure design, value engineering, project readiness, bankability and other areas, in discussions with DGWR and BAPPENAS. B. Strategic Works (i) Support the development of strategies for water resources management and its impact on agricultural development, in consultation with relevant government agencies. (ii) Contribute to the updating of the sector assessment for water resources and food security. (iii) Support the preparation of the background study for the government’s 2020–2024 mid-term development plan (iv) Review government planning and design guidelines for river infrastructure and recommend improvements for complying with international best practices on climate resilience, bioengineering and seismic risk proofing. C. Investment Preparation (i) Provide technical support to relevant agencies for the preparation of pipelined investments, including coordination with ADB’s partners (IHE-Delft, European Space Agency and others) that are supporting design of investments (ii) Conduct consultations with river basins stakeholders to review and confirm proposed investments in selected river basins. (iii) Review terms of reference, feasibility studies and engineering design for infrastructure subprojects prepared under the Accelerating Infrastructure Delivery through Better Engineering Services Project and under the Flood Management in Selected River Basins Sector Project. (iv) Identify best practices (climate adaptation, seismic risk proofing, water efficiency) relevant to the project and formulate activities to be part of the investment. (v) Support the preparation of the Report and Recommendation of the President to the Board of Directors (RRP) for proposed investments. (vi) Update as required the readiness documentation in close coordination with the Directorate of Planning and Programming, DGWR, and the Directorate of Multilateral Funding, BAPPENAS. (vii) Facilitate focus group discussions to review project preparation progress. Output/Reporting Requirements The consultant will prepare the following formal reports: (i) Monthly briefs for ongoing projects, covering progress, issues and actions; (ii) Specific sections of the project concept paper and Report and Recommendation of the President to the Board of Directors (RRP) for new projects; (iii) Monthly administrative reports following ADB template (monthly); and (iv) Working group materials and discussion and technical notes as required.


Minimum Qualification Requirements

The consultant must have a higher degree (M.Sc. or equivalent), in civil engineering or water resources. The consultant must have at least 10 years of relevant experience in managing and/or developing water infrastructure projects covering flood risks management, raw water supply, and irrigation, with a strong focus on operational and technical matters. Experience in mathematical modelling for flood routing, institutional and policy aspects of water management, and operational efficiencies in terms of climate change adaptation and socio-environmental aspects is essential. Experience in hydrological review to optimize basin water resources and climate change vulnerability assessment of water projects is also essential. Knowledge of the government planning cycle, procurement procedures and financial management mechanisms would be an advantage. He/she must have excellent written and oral communications skills. 

 

Minimum General Experience
    10
Years
Minimum Specific Experience (relevant to assignment)
    10
Years
Regional/Country Experience
    Read only Checkbox Checked Required
    Read only Checkbox Not Checked Desired
    Read only Checkbox Not Checked Not Required
     

 

 

Schedule and Places of Assignment (chronological and inclusive of travel)

Schedule Type
    Read only Checkbox Checked Continuous
    Read only Checkbox Not Checked Intermittent
   
Max. Working Days/Week
Home Office 5
Field 6
   
   
City and Country Working Days Estimated Start Date Estimated End Date Other Details (use if place selected is Others)
Jakarta, Indonesia 200 20-Apr-2018 24-Jan-2019  
Other City, Indonesia 20 25-Jan-2019 19-Apr-2019 Serang
  Total
220

 

 

Cost Items Amount in USD
Remuneration and Other Expenses
All activities and inputs in the TOR but not limited to remuneration, per diem, air travel, miscellaneous travel expenses, report preparation, production, and transmission, land transportation, communications, etc.
148,674
Contingency 1,326
TOTAL
150,000

Information

Taxonomy