High-end Bioaugmentation solutions for wastewater treatment plants
Published on by Szabolcs Malaczko for Malatech Water, Ltd.
Do not hesitate to contact us if you have troubles with your activated sludge or attached growth wastewater treatment plant, like:
- nitrification issues
- issues with denitrification, effluent total nitrogen (TN) reduction
- COD removal, BOD removal issues
- insufficient Bio-P removal (Biological Phosphorus Removal)
- high FOG load
- high TSS in effluent
- overload or underload, any effluent parameter issues
- filamentous blooming, bulking sludge, settling issues, sludge washout
- foaming problems
- inhibitory or toxic loads
- nutrient or micronutrient deficiency
- reduction of electricity consumption
- reduction of excess sludge production
- hot or cold weather operational and performance issues of the activated sludge
- any other problems related to activated sludge or attached growth microbiology
- operational cost reduction for well-operating WWTP’s without any effluent issues
Attached link
https://www.malatechwater.com/our-technologies/biological-wastewater-treatmentTaxonomy
- Bioaugmentation