Q2. drain and refill the cooling tower , A2. the circulating water volume is huge (40,000 M3/hr), it is almost impossible to do.
Published by Lin JYH-YAN, advanced engineer at FORMOSA PETROCHEMICAL CORPORATION
Q2. drain and refill the cooling tower , A2. the circulating water volume is huge (40,000 M3/hr), it is almost impossible to do.