The FIRST consideration is ...
Published by Steven Cooke, President, Process Systems Consulting
The FIRST consideration is the anticipated or required volume of water required. The second is the available source(s) - volumes, depth, chemistry. Everything after that is engineering and budgets. You may use the values for water demand from the "AI" response posted.