Hello nice meet to you, I currently work in Hitachi.It is from my private growth company. My Private has contributed to the 1186 mega PROJE...

Published on by

Hello nice meet to you, I currently work in Hitachi.It is from my private growth company. My Private has contributed to the 1186 mega PROJECT launch in just four years.Mainly PROJECT cost, proposal, procurement cost is Line Line adjustment, new product development project, design.The twelfth 200ha that we recently released. We are looking for Energy Solar's SPC project finance. The land of 200 hectares is the plane of the inland area. My position belongs to the owner side. EPC candidates are also on standby.Output: Module / 335 W (min-height 235 to Max 264 Mega)Output: Module / 355 W (min - height 249 - Max 280 Mega)Power selling price(Japan): ¥ 22C / W. PROJECT Budget: \ 230 C / W.Power selling price(US):: $ 0.21 C / W. PROJECT Budget: $ 0.22 C / W.The thirteenth 80ha is also prepared.№ 12.13 is scheduled to start construction in Japan at the beginning of 2017.№ 12. 200 hectares is the planeOutput: Module / 335 W (min-height 235 to Max 264 Mega)PROJECT Budget: $ 0.22 C / W. (min-height 235 million to Max 264 million)Output: Module / 355 W (min - height 249 - Max 280 Mega)PROJECT Budget: $ 0.22 C / W. (min-height 249 million to Max 280 million) № 13. 80 hectares is the planeOutput: Module / 335 W (min-height 94 to Max 106 Mega)PROJECT Budget: $ 0.22 C / W. (min-height 94 million to Max 106 million)Output: Module / 355 W (min - height 99 - Max 112 Mega)PROJECT Budget: $ 0.22 C / W. (min-height 99 million to Max 112 million) № 14.15 is scheduled to start construction in Japan at the beginning of 2017№ 14. 200 hectares is the planeOutput: Module / 335 W (min-height 235 to Max 264 Mega)PROJECT Budget: $ 0.22 C / W. (min-height 235 million to Max 264 million)Output: Module / 355 W (min - height 249 - Max 280 Mega)PROJECT Budget: $ 0.22 C / W. (min-height 249 million to Max 280 million) № 15. 200 hectares is the planeOutput: Module / 335 W (min-height 235 to Max 264 Mega)PROJECT Budget: $ 0.22 C / W. (min-height 235 million to Max 264 million)Output: Module / 355 W (min - height 249 - Max 280 Mega)PROJECT Budget: $ 0.22 C / W. (min-height 249 million to Max 280 million) We have backed goods.Private company is one of the most successful teams.For this wonderful occasion I would like to share more information!I am looking forward to hearing from you with your interests!Sincerely,Syo Kawamura 

1 Comment

  1. I certainly respect the well-known company, but I want to give advice - apply technology more interesting than the conversion of solar energy into electrical energy. Calculate the performance of electric energy per square meter of floor space and look at the result - it is worth it or not. I always thought that Japan used the most advanced technology, especially in the energy sector.
    Ready to offer the joint production of a new type of wind turbine with an efficiency (efficiency) of 32%, instead of 5% of the Dutch windmills. Developed design takes up less space, does not emit ultrasound, has the potential to produce electric power up to 120 - 150 MW in the same installation, with the possibility of accommodation in the sea. Equipment not afraid squall, gale-force winds, uses the power of all types of winds - from low potential - to the hurricane.
     
    Cost of 1kW of installed capacity does not exceed $ 300 per kW. Perhaps the production and installations with smaller capacity. Minimum - 50 kW.
     
    If you are interested in the application of new technologies - with pleasure ready to help.
    tumentsev@inbox.ru