Kindly share (a) Standard Models if available (Thru put capacity M3/ Hr.) (b) Energy required per hour and (c) Capital Cost of each standard model and (e) Recurring Costs or Operational costs other than Power inputs (f) Delivery period..
Published by LOKESH PUNJ, A B.TECH. Agr Engg, PGDM-SPA IIMA (1977-9) 25 yrs in Water Piping / Irrigation/Infra Projects
Kindly share (a) Standard Models if available (Thru put capacity M3/ Hr.) (b) Energy required per hour and (c) Capital Cost of each standard model and (e) Recurring Costs or Operational costs other than Power inputs (f) Delivery period..