It is not clear when the RO plant was awarded, but it seems that commissioning by the third quarter is 2016 is rather ambitious.As for the power plant of 2400 MW and an assumed cost of 500,000,000 $ it seems that the the unit cost of 208,000 $ per MW is on the low side, Is it possible to know what type of generation (steam turbines or gas turbines) and the unit output.

Published by

It is not clear when the RO plant was awarded, but it seems that commissioning by the third quarter is 2016 is rather ambitious.As for the power plant of 2400 MW and an assumed cost of 500,000,000 $ it seems that the the unit cost of 208,000 $ per MW is on the low side, Is it possible to know what type of generation (steam turbines or gas turbines) and the unit output.