Plantita

Published on by for AguaClara Reach

Plantita

For raw water  up to 1000  NTU,  the Plantita can ​support populations between 300 and 3,000 people. ​Water is ​purified in a ​five step ​treatment train:​ coagulation-​flocculation-​sedimentation-​filtration-​disinfection. ​At no point in ​the treatment ​process is any ​electricity ​required. ​

This high ​turbidity ​plant is prefabricated, ​using locally ​available ​materials such ​as PVC pipe and polycarbonate ​sheets. The ​unit can be manufactured locally, ​and the ​treatment ​system can be ​operated and ​maintained by a ​person with a ​6th grade ​education. O&M, ​including ​savings for ​long-term ​repairs ​costs 2-5 ​USD per ​household per ​month. ​

Media

Taxonomy