Plantita

Published on by for AguaClara Reach, Inc.

Plantita

For raw water  up to 1000  NTU,  the Plantita  can support populations between 300 and 3,000 people. Water is purified in a five step treatment train: coagulation- flocculation- sedimentation- filtration- disinfection. At no point in the treatment process is any electricity required.

This  high turbidity plant is prefabricated, using locally available materials such as PVC pipe and polycarbonate sheets. The unit can be manufactured locally, and the treatment system can be operated and maintained by a person with a 6th grade education. O&M, including savings for long-term repairs  costs 2-5 USD per household per month.

Media

Taxonomy