Design of a Constructed Wetland for Grey Water
Published on by Megan Galloway, Water consultant at Royal HaskoningDHV in Non Profit
Hi all,
I am designing a wetland for treatment of grey water from showers at a charcoal factory in central Namibia where 200 people shower per day.
The design loading is 10 m3 per day and using the Kickuth equation I have a surface area of about 65 m2.
I have selected a horizontal flow SSFCW wetland with an existing septic tank as preliminary treatment.
Has anyone in Southern Africa done a similar design with a cost projection for the materials required?
Thanks in advance
Megan